Alder Street Community Centre
Project Summary
Client
EllisDon Construction
Electrical Scope
$1.04 million
Year Completed
2005
Size
140,000 sq.ft.
Sectors
Culture Recreation
Delivery Model
Design Build
This 140,000-square-foot, multi-purpose recreational facility serving the Town of Orangeville presented unique design-build requirements from an electrical standpoint. The facility houses two 200-foot by 85-foot arena ice pads, including a 900-seat arena for Ontario Junior A hockey games. Additionally, it houses a six-lane lap pool, a leisure pool with 10 therapeutic jets and two water toys, and an indoor waterslide.
The centre houses an Orangeville branch library, administrative offices, a gymnastics and trampoline club as well as a food concession, restaurant and skate-sharpening facility.